Description
A pre-lease of 68,500 sq ft has been secured and a 40 acre parcel of land has been sold for data centre use. Unit 1, a 40,000 sq ft logistics facility is under construction on a speculative basis and is targeted for Completion in Q4 2026. Click here for the Unit 1 brochure.
Site infrastructure and enabling works are underway to create a vertical-ready central development plot for summer 2026. At the same time Reserved Matters planning consent has been obtained for a single cross-dock logistics facility of 640,000 sq ft which will be speculatively constructed. Vertical build will commence in September 2026 with completion of the unit in Q4 2027.
Mountpark Ferrybridge builds upon the next generation of specifications and building practices such as carbon net-zero capabilities, target BREEAM
'Outstanding' credentials and an emphasis on staff wellness, which will make it a market-leading campus.
Key aspects of the development are:
- Cross docked with two 50m yards
- 21 m clear internal height
- 88 dock level loading doors (50% Eurodock)
- 6 ground level loading doors
-132 HGV parking spaces
- 445 car parking spaces (including 44 EV charging points)
- Target BREEAM 'outstanding'
- EPC A+
- Up to 13 MVA power available
- Rooftop PV included
Similar properties in the area
Industrial to let
Mountpark Ferrybridge, Kirkhaw Lane, Ferrybridge, WF11 8UL
640382 sq. ft (59493.49 m²)
New Prime Distribution Unit
Industrial to let
Unit 1 Mountpark Ferrybridge, Kirkhaw Lane, Ferrybridge, WF11 8UL
40008 sq. ft (3716.87 m²)
Prime mid-box distribution unit
Industrial for sale
Unit 1 Mountpark Ferrybridge, Kirkhaw Lane, Ferrybridge, Wakefield, West Yorkshire, WF11 8UL
Unit 1 (40,000 sq ft) makes up part of the initial build phase at Mountpark Ferrybridge and is under construction on a speculative basis with completion targeted for Q4 2026. At the same time, infrastructure and enabling works are well progressed for t...
Industrial to let
Unit 1 Mountpark Ferrybridge, Kirkhaw Lane, Ferrybridge, Wakefield, West Yorkshire, WF11 8UL
Unit 1 (40,000 sq ft) makes up part of the initial build phase at Mountpark Ferrybridge and is under construction on a speculative basis with completion targeted for Q4 2026. At the same time, infrastructure and enabling works are well progressed for t...